Please ensure Javascript is enabled for purposes of website accessibility TOPS Project Planning Pads (TOP77102) | SuperWarehouse.com

TOPS Project Planning Pads (TOP77102)

Model: TOP77102
Small Package; Eligible for UPS Shipping Physical Challenged Owned Business
TOPS

TOPS Project Planning Pads (TOP77102)

Model: TOP77102
Small Package; Eligible for UPS Shipping Physical Challenged Owned Business
TOPS
  • 8 1/2" x 11 3/4" Sheet Size - White - Chipboard - Perforated - 4 / Pack

$17.91
  • In Stock

Product Description

Wide-margin planning pad is ideal for project notes and reminders. Unique sheet layouts aid planning, design and communication to help you organize notes and tasks to keep projects moving. Faintly printed horizontal rules reduce visual distraction and produce cleaner photocopies. Along with the wide margin on the front, a header at top of sheet provides space to record date, project and page number. Bottom box offers a place for a task list. Back of the sheet features grid ruling. Heavyweight paper prevents bleed-through to next sheet. Letter-size pad contains 40 stitched sheets of 20 lb. white bond sheets. Letr-Trim perforations allow clean and easy sheet removal. The heavyweight, 60 point chipboard backer provides firm writing support.

Product Features

  • Unique layouts aid planning, design and communication

  • Wide margin

  • Grid ruling on back

  • Heavyweight, 20 lb. paper

  • Letr-Trim perforations for a clean, "cut-sheet" look

Product Specs

Manufacturer

TOPS

Manufacturer Stock No.

77102

MPN

TOP77102

Model#

77102

UPC Code

818260046788

UNSPSC Code

0

Brand Name

TOPS

Country of Origin

United States

Environmental Certification

Sustainable Forestry Initiative (SFI)

Features

Perforated

Manufacturer

TOPS Products

Manufacturer Part Number

77102

Manufacturer Website Address

http://www.tops-products.com

Packaged Quantity

4 / Pack

Product Line

Docket

Product Name

Project Planning Pads

Product Type

Planner

Recycled

No

Sheet Height

11 3/4"

Sheet Quantity

40

Sheet Width

8 1/2"

Weight (Approximate)

20 lb

Product color

White

Product material

Chipboard

Assembly Required

No assembly is required

Contains Recycled Materials

N

Returnable

No

Business Type

Physical Challenged Owned Business

Unit of Measure

PK

Item Weight

1.8

Ships via UPS

Y

Brand

TOPS

Country of Origin

US

UNSPSC Number

44112004

Top Trending Products

Monoprice Workstream By Workstation (34543)

$51.12

Sentry Safe Fire-Safe with Combination Access, 2 cu ft, 18.6w x 19.3d x 23.8h, Black (SENSFW205CWB)

$450.96

Brita Replacement Water Filter for Pitchers (CLO35503)

$19.26

Energizer 9-Volt MAX Alkaline Batteries (EVE522BP2)

$13.77

Logitech Signature M650 Wireless Mouse, Large, 2.4 GHz Frequency, 33 ft Wireless Range, Right Hand Use, Graphite (910006231)

$43.20

NETGEAR 5-port Gigabit Ethernet Unmanaged Switch (GS305300PAS)

$229.99

NETGEAR 8-port Gigabit Ethernet Poe+ Smart Managed Plus Switch (GS308EP100NAS)

$109.66

NETGEAR 8-port Gigabit Poe Eth Managed Pro (GS110TP300NAS)

$199.99

APC Back-UPS 600 VA Battery Backup System, 7 Outlets, 120 VA, 490 J (BE600M1)

$106.69

Braun Honeywell ThermoScan 5 Ear Thermometer (HWLIRT6500US)

$57.90

Diversey Crew Super Blue Acid Bowl Cleaner (DVO94476081)

$60.95

Dixie PerfecTouch 16 oz Insulated Paper Hot Coffee Cups by GP Pro (DXE5356DX)

$88.54

TOPS Project Planning Pads (TOP77102) Reviews

SuperWarehouse.com is a leading distributor of business supplies including office, cleaning, medical, food, furniture, tools, industrial, computers, pos, janitorial, school supplies and more. We offer wholesale pricing on the TOPS Project Planning Pads (TOP77102). SuperWarehouse.com connects hundreds of suppliers with customers from all industries, including schools, federal government, medical, accounting, corporate, educational, healthcare, finance, and military. Everything you see on SuperWarehouse.com including the TOPS Project Planning Pads (TOP77102) are stocked in over 20 distribution centers. As a customer you will receive monthly coupons and deals.

Images