Please ensure Javascript is enabled for purposes of website accessibility TOPS Noteworks Project Planner (TOP63826) | SuperWarehouse.com

Consider These Items See More Products

TOPS Project Planning Pads (TOP77102)

$17.07

TOPS Docket Gold Wirebound Project Planner (TOP63754)

$12.58

TOPS Action Planner (TOP63828)

$10.66

AT-A-GLANCE Signature Lite Weekly Monthly Planner (YP200L05)

$11.93

AT-A-GLANCE Signature Lite Weekly Monthly Planner (YP905L05)

$16.30

House of Doolittle Recycled Non-Dated Planner (212152)

$8.43

AT-A-GLANCE Signature Large Wkly/Mthly Planner (YP20001)

$21.57

Mead Five Star Student Academic Planner (AAGCAW45100)

$15.88

House of Doolittle Planner (262502)

$25.47

At-A-Glance DayMinder Monthly Planner (GC47007)

$21.28

Blueline Undated Task Planner (REDB31081)

$19.22

Teacher Created Resources Confetti Lesson Planner (TCR2152)

$17.99

TOPS Noteworks Project Planner (TOP63826)

Model: TOP63826
Small Package; Eligible for UPS Shipping Physical Challenged Owned Business
TOPS
TOPS Noteworks Project Planner (TOP63826)

TOPS Noteworks Project Planner (TOP63826)

Model: TOP63826
Small Package; Eligible for UPS Shipping Physical Challenged Owned Business
TOPS
  • 6 3/4" x 8 1/2" White Sheet - Wire Bound - Poly, Plastic, Chipboard - Metallic Gold CoverPerforated, Acid-free, Tear-off, Snag Resistant - 1 Each

$12.26
  • Out Of Stock

Product Description

Noteworks Project Planner features a special ruling simple and concise notes. Gold metallic plastic cover stands up under heavy use. Numbered line format is printed on the front and back. Letr-Trim perforation on each 16 lb. acid-free sheet allows clean tear-out. Heavy, 60 point chipboard back offers reliable writing support. Coil-lock wire binding on the side prevents snagging.

Product Features

  • Special ruling allows simple and concise notes

  • Plastic cover withstands heavy use

  • Numbered lines on front and back for easy tracking

  • Letr-Trim perforations for easy sheet removal

Product Specs

Manufacturer

TOPS

Manufacturer Stock No.

63826

MPN

TOP63826

Model#

63826

UPC Code

823019820311

UNSPSC Code

0

Binding Type

Wire Bound

Brand Name

TOPS

Country of Origin

United States

Cover Color

Metallic Gold

Features

Perforated, Acid-free, Tear-off, Snag Resistant

Manufacturer

TOPS Products

Manufacturer Part Number

63826

Manufacturer Website Address

http://www.tops-products.com

Packaged Quantity

1 Each

Product Line

Noteworks

Product Name

Noteworks Project Planner

Product Type

Planner

Recycled

No

Sheet Color

White

Sheet Height

8 1/2"

Sheet Quantity

70

Sheet Width

6 3/4"

Product material

Poly, Plastic, Chipboard

Assembly Required

No assembly is required

Contains Recycled Materials

N

Returnable

No

Business Type

Physical Challenged Owned Business

Unit of Measure

EA

Item Weight

0.5

Ships via UPS

Y

This item is sold by the

EA

Brand

TOPS

Country of Origin

US

UNSPSC Number

44112008

TOPS Noteworks Project Planner (TOP63826) Reviews

SuperWarehouse.com is a leading distributor of business supplies including office, cleaning, medical, food, furniture, tools, industrial, computers, pos, janitorial, school supplies and more. We offer wholesale pricing on the TOPS Noteworks Project Planner (TOP63826). SuperWarehouse.com connects hundreds of suppliers with customers from all industries, including schools, federal government, medical, accounting, corporate, educational, healthcare, finance, and military. Everything you see on SuperWarehouse.com including the TOPS Noteworks Project Planner (TOP63826) are stocked in over 20 distribution centers. As a customer you will receive monthly coupons and deals.

Images